Banton Construction Company
Menu
  • Markets
  • About
    • Banton Today
    • Why Banton?
    • Management
    • Safety
    • Fundraising
    • History
  • Careers
  • Contact
Home » Markets » Sewer, Water & Wastewater Portfolio » Motor Control Center Upgrades

Motor Control Center Upgrades

 Sewer, Water & Wastewater Portfolio

Motor Control Center Upgrades

Location:

East Hartford, Connecticut

Owner:

The Metropolitan District Commission

Banton was contracted to perform the full automation of two incinerators, as well as installation of new instrumentation and the integration of existing instrumentation into a new SCADA system and control room constructed by Banton. Banton also replaced three of the MDC’s existing motor control centers in order to meet the needs of the new SCADA system.

Banton Construction Company. All Rights Reserved. ©2025

339 Washington Avenue, North Haven, CT 06473  |  Phone: (203) 234-2353  |  Fax: (203) 234-0010

BBB A+ rating  LinkedIn logo

Powered by SoSimple